Notification details

Candidates may please note that this notification is in continuation to our earlier  Advt. No. CC /06/2020 dtd. 6th Oct   2020   and subsequent notices no.   1,2&3   regarding recruitment of   Executive  Trainee  26th  batch in POWERGRID.

 

VACANCIES & RESERVATION

Number of Vacancies

Post UR OBC (NCL) SC ST EWS Total
ET (Electrical) 12 05 00 01 02 20
ET (Electronics) 06 01 01 01 01 10
ET (Civil) 05 01 02 00 02 10

 

PwD RESERVATION & IDENTIFICATION

Post PwD Reservation*
ET (Electrical) 01 - Hearing Impaired (Deaf & Hard of Hearing)
ET (Electronics) 01 - Inter-changeable (HI, OH, combination of identified sub-categories)

*Horizontal

The posts are identified as suitable for the following subcategories of PwBD:

Posts: ET (Electrical)/ ET (Electronics)/ ET (Civil)

  1. Deaf & Hard of Hearing
  2. Orthopedically Handicap - One Leg/ One Arm,

Also includes Acid Attack victims and Leprosy Cured persons with the above disabilities

  • Combinations of (i) and (ii) above

 

ELIGIBILITY CRITERIA

Please refer to our detailed Advt. No. CC /06/2020 dtd.6th Oct 2020.

About PGCIL

Company Profile

POWERGRID, the Central Transmission Utility (CTU) of India, one of the largest Transmission Utilities in the World and a Navratna Enterprise of Govt. of India is engaged in power transmission business with the mandate for planning, co-ordination, supervision and control over complete inter-State transmission system. POWERGRID operates around 1,41,920 circuit kms of transmission lines along with 224 Sub-stations (as on 31.08.2017) and wheels about 50% of total power generated in the country through its ransmission network. POWERGRID also owns and operates approximately 43,450 kms of Telecom Network, with points of presence in approx. 662 locations and intra-city network in 105 cities across India. POWERGRID, with its strong in-house expertise in various facets of Transmission, Sub-Transmission, Distribution and Telecom sectors also offers consultancy services at National and International level. POWERGRID has been making profit since inception, having Gross turnover of Rs. 26,581 Crore and Profit After Tax of Rs. 7,520 Crore (FY: 2016 - 17). To take the growth curve to further heights, POWERGRID is looking for Bright, Committed and Energetic engineers to join its fold as EXECUTIVE TRAINEEs in the disciplines of Electrical, Electronics, Civil and Computer Science.

Streams

Electrical Engineering  :    
Electronics & Communication  :    
Civil Engineering  :    
Important Dates
Notification Date  :     15/03/2021
Application Start Date  :     25/03/2021
Application End Date  :     15/04/2021